Application scenarios
















New value
ELECTRIC NETWORK FROM 10-40Kw
From 10 kW to 40 kW.
No grid: charge at 120 kW.
10 kW: charge at 130 kW.
20 kW: charging at 140 kW.
40 kW: charging at 160 kW.
No civil works
Lower operating cost flexible deployment
The monthly cost of our charger with battery is significantly lower compared to a conventional 200 kW charger without battery. This is because the maximum input power required by our equipment is only 40 kW, which optimizes energy consumption and reduces operating costs.

Compatibility with all electric vehicle models